Tilt Assembly: Algorithms for Micro-Factories That Build Objects with Uniform External Forces

September 19, 2017 Β· Declared Dead Β· πŸ› Algorithmica

πŸ‘» CAUSE OF DEATH: Ghosted
No code link whatsoever

"No code URL or promise found in abstract"

Evidence collected by the PWNC Scanner

Authors Aaron T. Becker, SΓ‘ndor P. Fekete, Phillip Keldenich, Dominik Krupke, Christian Rieck, Christian Scheffer, Arne Schmidt arXiv ID 1709.06299 Category cs.DS: Data Structures & Algorithms Cross-listed cs.CC, cs.CG Citations 33 Venue Algorithmica Last Checked 3 months ago
Abstract
We present algorithmic results for the parallel assembly of many micro-scale objects in two and three dimensions from tiny particles, which has been proposed in the context of programmable matter and self-assembly for building high-yield micro-factories. The underlying model has particles moving under the influence of uniform external forces until they hit an obstacle; particles can bond when being forced together with another appropriate particle. Due to the physical and geometric constraints, not all shapes can be built in this manner; this gives rise to the Tilt Assembly Problem (TAP) of deciding constructibility. For simply-connected polyominoes $P$ in 2D consisting of $N$ unit-squares ("tiles"), we prove that TAP can be decided in $O(N\log N)$ time. For the optimization variant MaxTAP (in which the objective is to construct a subshape of maximum possible size), we show polyAPX-hardness: unless P=NP, MaxTAP cannot be approximated within a factor of $Ξ©(N^{\frac{1}{3}})$; for tree-shaped structures, we give an $O(N^{\frac{1}{2}})$-approximation algorithm. For the efficiency of the assembly process itself, we show that any constructible shape allows pipelined assembly, which produces copies of $P$ in $O(1)$ amortized time, i.e., $N$ copies of $P$ in $O(N)$ time steps. These considerations can be extended to three-dimensional objects: For the class of polycubes $P$ we prove that it is NP-hard to decide whether it is possible to construct a path between two points of $P$; it is also NP-hard to decide constructibility of a polycube $P$. Moreover, it is expAPX-hard to maximize a path from a given start point.
Community shame:
Not yet rated
Community Contributions

Found the code? Know the venue? Think something is wrong? Let us know!

πŸ“œ Similar Papers

In the same crypt β€” Data Structures & Algorithms

Died the same way β€” πŸ‘» Ghosted