Multistage Knapsack
January 31, 2019 Β· Declared Dead Β· π International Symposium on Mathematical Foundations of Computer Science
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Evripidis Bampis, Bruno Escoffier, Alexandre Teiller
arXiv ID
1901.11260
Category
cs.DS: Data Structures & Algorithms
Citations
27
Venue
International Symposium on Mathematical Foundations of Computer Science
Last Checked
3 months ago
Abstract
Many systems have to be maintained while the underlying constraints, costs and/or profits change over time. Although the state of a system may evolve during time, a non-negligible transition cost is incured for transitioning from one state to another. In order to model such situations, Gupta et al. (ICALP 2014) and Eisenstat et al. (ICALP 2014) introduced a multistage model where the input is a sequence of instances (one for each time step), and the goal is to find a sequence of solutions (one for each time step) that are both (i) near optimal for each time step and (ii) as stable as possible. We focus on the multistage version of the Knapsack problem where we are given a time horizon t=1,2,...,T, and a sequence of knapsack instances I_1,I_2,...,I_T, one for each time step, defined on a set of n objects. In every time step t we have to choose a feasible knapsack S_t of I_t, which gives a knapsack profit. To measure the stability/similarity of two consecutive solutions S_t and S_{t+1}, we identify the objects for which the decision, to be picked or not, remains the same in S_t and S_{t+1}, giving a transition profit. We are asked to produce a sequence of solutions S_1,S_2,...,S_T so that the total knapsack profit plus the overall transition profit is maximized. We propose a PTAS for the Multistage Knapsack problem. Then, we prove that there is no FPTAS for the problem even in the case where T=2, unless P=NP. Furthermore, we give a pseudopolynomial time algorithm for the case where the number of steps is bounded by a fixed constant and we show that otherwise the problem remains NP-hard even in the case where all the weights, profits and capacities are 0 or 1.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Data Structures & Algorithms
π
π
The Cartographer
R.I.P.
π»
Ghosted
Route Planning in Transportation Networks
R.I.P.
π»
Ghosted
Near-linear time approximation algorithms for optimal transport via Sinkhorn iteration
R.I.P.
π»
Ghosted
Hierarchical Clustering: Objective Functions and Algorithms
R.I.P.
π»
Ghosted
Graph Isomorphism in Quasipolynomial Time
π
π
The Cartographer
Simulation optimization: A review of algorithms and applications
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted