Scheduling Precedence-Constrained Jobs on Related Machines with Communication Delay
April 22, 2020 Β· Declared Dead Β· π IEEE Annual Symposium on Foundations of Computer Science
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Biswaroop Maiti, Rajmohan Rajaraman, David Stalfa, Zoya Svitkina, Aravindan Vijayaraghavan
arXiv ID
2004.10776
Category
cs.DS: Data Structures & Algorithms
Cross-listed
cs.DC
Citations
12
Venue
IEEE Annual Symposium on Foundations of Computer Science
Last Checked
3 months ago
Abstract
We consider the problem of scheduling $n$ precedence-constrained jobs on $m$ uniformly-related machines in the presence of an arbitrary, fixed communication delay $Ο$. We consider a model that allows job duplication, i.e. processing of the same job on multiple machines, which, as we show, can reduce the length of a schedule (i.e., its makespan) by a logarithmic factor. Our main result is an $O(\log m \log Ο/ \log \log Ο)$-approximation algorithm for minimizing makespan, assuming the minimum makespan is at least $Ο$. Our algorithm is based on rounding a linear programming relaxation for the problem, which includes carefully designed constraints capturing the interaction among communication delay, precedence requirements, varying speeds, and job duplication. Our result builds on two previous lines of work, one with communication delay but identical machines (Lepere, Rapine 2002) and the other with uniformly-related machines but no communication delay (Chudak, Shmoys 1999). We next show that the integrality gap of our mathematical program is $Ξ©(\sqrt{\log Ο})$. Our gap construction employs expander graphs and exploits a property of robust expansion and its generalization to paths of longer length. Finally, we quantify the advantage of duplication in scheduling with communication delay. We show that the best schedule without duplication can have makespan $Ξ©(Ο/\log Ο)$ or $Ξ©(\log m/\log\log m)$ or $Ξ©(\log n/\log \log n)$ times that of an optimal schedule allowing duplication. Nevertheless, we present a polynomial time algorithm to transform any schedule to a schedule without duplication at the cost of a $O(\log^2 n \log m)$ factor increase in makespan. Together with our makespan approximation algorithm for schedules allowing duplication, this also yields a polylogarithmic-approximation algorithm for the setting where duplication is not allowed.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Data Structures & Algorithms
π
π
The Cartographer
R.I.P.
π»
Ghosted
Route Planning in Transportation Networks
R.I.P.
π»
Ghosted
Near-linear time approximation algorithms for optimal transport via Sinkhorn iteration
R.I.P.
π»
Ghosted
Hierarchical Clustering: Objective Functions and Algorithms
R.I.P.
π»
Ghosted
Graph Isomorphism in Quasipolynomial Time
π
π
The Cartographer
Simulation optimization: A review of algorithms and applications
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted